Western New York Solar Site

EDGE EarthGuard Pellets
Success Story

Western New York Solar Site
EDGE™ EarthGuard® Pellets Case Study

Location: Western New York

Solar Site Achieves Regulatory Compliance with EDGE™ EarthGuard® Pellets

Challenge: A large-scale solar installation project in Western New York encountered significant environmental compliance challenges. With 1,200 acres under development and strict regulatory requirements mandating site erosion control winterization by October 30, 2024, the contractor needed an immediate solution for turbid water discharges that threatened project timelines and compliance status.

Solution: After evaluating available options, the contractor selected LSC’s EDGE™ EarthGuard® Pellets for their:

  • Innovative dry-application technology requiring no water for installation
  • Advanced flocculating and erosion control properties designed for challenging soil conditions
  • Proven performance in similar large-scale applications
  • Ease of installation across difficult terrain

The team applied 3,000 pounds of EDGE™ EarthGuard® Pellets per acre across 150 acres identified as high-risk discharge areas.

EDGE Spreader applying EDGE EarthGuard Pellets across the site
Using an EDGE™ Spreader to apply EDGE™ EarthGuard® Pellets.

Results: Six months after application (April 2, 2025), the site demonstrated exceptional erosion control performance:

  • Complete elimination of turbid water discharges from EDGE™ treated areas
  • Sustained performance through winter conditions
  • Visible tracer dye confirming continued product presence and effectiveness
  • Full regulatory compliance throughout inspection periods
Crystal clear stormwater in a low spot of the treated area
Crystal clear stormwater observed in low spot.
Close up of clear stormwater on the treated area
Close up of clear stormwater.
Turbid runoff on an untreated area of the site
Untreated area on site.

“The results speak for themselves. Since applying EDGE™ EarthGuard® Pellets, we’ve had no turbid water issues on-site. It’s a clear testament to the product’s effectiveness in meeting regulatory standards.”

Project Manager

Based on this success, the contractor has incorporated EDGE™ EarthGuard® Pellets into their standard environmental compliance protocol for all future solar development projects.

Ask an Industry Expert


Related Documents

Solar Site Achieves Regulatory Compliance with EDGE™ EarthGuard® Pellets 908.8 KB

Need Help Getting Started With Us?

Let our experts match our innovative solutions to the unique challenges facing your industry.

Find a Solution